Page:United States Statutes at Large Volume 124.djvu/2843

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

124 STAT. 2817 PUBLIC LAW 111–267—OCT. 11, 2010 (3) shall complete construction and activation of the A– 3 test stand with a completion goal of September 30, 2013; (4) may procure, develop, and flight test applicable compo- nents; and (5) shall take appropriate actions to ensure timely and cost-effective development of the Space Launch System and the multi-purpose crew vehicle, including the use of a procure- ment approach that incorporates adequate and effective over- sight, the facilitation of contractor efficiencies, and the stream- lining of contract and procurement requirements. SEC. 305. NASA LAUNCH SUPPORT AND INFRASTRUCTURE MOD- ERNIZATION PROGRAM. (a) IN GENERAL.—The Administrator shall carry out a program the primary purpose of which is to prepare infrastructure at the Kennedy Space Center that is needed to enable processing and launch of the Space Launch System. Vehicle interfaces and other ground processing and payload integration areas should be sim- plified to minimize overall costs, enhance safety, and complement the purpose of this section. (b) ELEMENTS.—The program required by this section shall include— (1) investments to improve civil and national security oper- ations at the Kennedy Space Center, to enhance the overall capabilities of the Center, and to reduce the long term cost of operations and maintenance; (2) measures to provide multi-vehicle support, improve- ments in payload processing, and partnering at the Kennedy Space Center; and (3) such other measures, including investments to improve launch infrastructure at NASA flight facilities scheduled to launch cargo to the ISS under the commercial orbital transpor- tation services program as the Administrator may consider appropriate. (c) REPORT ON NASA LAUNCH SUPPORT AND INFRASTRUCTURE MODERNIZATION PROGRAM.— (1) REPORT REQUIRED.—Not later than 120 days after the date of the enactment of this Act, the Administrator shall submit to the appropriate committees of Congress a report on the plan for the implementation of the NASA launch support and infrastructure modernization program. (2) ELEMENTS.—The report required by this subsection shall include— (A) a description of the ground infrastructure plan tied to the Space Launch System and potential ground investment activities at other NASA centers related to supporting the development of the Space Launch System; (B) a description of proposed initiatives intended to be conducted jointly or in cooperation with Cape Canaveral Air Force Station, Florida, or other installations or compo- nents of the United States Government; and (C) a description of plans to use funds authorized to be appropriated by this Act to improve non-NASA facilities, which plans shall include a business plan outlining the nature and scope of investments planned by other parties. 42 USC 18325. Deadline.