1188 Floyd River, ^"Modification of project. 72 Stat. 312.
PUBLIC LAW 87-874-OCT. 23, 1962
[76 STAT.
The requirements of local cooperation on the project for flood control ^^ ^^® F l o j d River, Iowa, authorized by Public Law 85-500, as recommended by the Chief of Engineers in House Document Numbered 417, Eighty-fourth Congress, is hereby modified to read as follows: Provided, That responsible local interests give assurances satisfactory to the Secretary of the Army that they will (a) furnish without cost to the United States all lands, easements, and rights-of-way necessary for construction of the project; (b) hold and save the United States free from damages due to the construction works; (c) make without cost to the United States all necessary road, highway, highway bridges other than those required to carry Interstate Highway 29 over the relocated Floyd River, and utility alterations and additions; (d) contribute in cash 0.84 per centum of the estimated first cost of the work for which the United States would be responsible, a contribution presently estimated at $65,000; (e) upon authorization of the project, to take all possible action under Iowa law, short of actual purchase, to prevent additional developments within the right-of-way that might increase the overall cost of the project; and (f) maintain and operate all the works after completion in accordance with regulations prescribal by the Secretary of the Army." O H I O RIVER B A S I N
The project for flood protection on the Kokosing River, Ohio, is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 220, Eighty-seventh Congress, at an estimated cost of $2,438,000. The project for flood protection on the Wabash River at and in the vicinity of Mount Carmel, Illinois, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 573, Eighty-seventh Congress, at an estimated cost of $1,417,000. The project for flood protection on the Mad River above Huffman Daiii, Ohio, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 439, Eighty-seventh Congress, at an estimated cost of $7,930,000. The project for the Kentucky River, Kentucky, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 423, Eighty-seventh Congress, at an estimated cost of $26,020,000. The project for Twelvepole Creek, West Virginia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 520, Eighty-seventh Congress, at an estimated cost of $11,000,000. The project for the Guyandot River and tributaries. West Virginia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 569, Eighty-seventh Congress, second session, at an estimated cost of $60,477,000. The project for flood protection on the Buckhannon River, West Virginia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 43, Eighty-seventh Congress, at an estimated cost of $1,206,000. The project for flood protection on Crab Creek at Youngstown, Ohio, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 440, Eighty-seventh Congress, at an estimated cost of $2,268,000. The project for the Scioto River, Ohio, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 587, Eighty-seventh Con-
�