Page:United States Statutes at Large Volume 79.djvu/1116

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[79 STAT. 1076]
PUBLIC LAW 89-000—MMMM. DD, 1965
[79 STAT. 1076]

1076

PUBLIC LAW 89-298-OCT. 27, 1965

[79 STAT.

MIDDLE ATLANTIC COASTAL AREA

The project for hurricane-flood protection and beach erosion control at Ocracoke Island, North Carolina, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 109, Eighty-ninth Congress, at an estimated cost of $1,636,000. F L I N T RIVER B A S I N

The project for the Lazer Creek Reservoir, Flint Eiver, Georgia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 567, Eighty-seventh Congress, at an estimated cost of $40,378,000. The project for the Lower Auchumpkee Reservoir, Flint River, Georgia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 567, Eighty-seventh Congress, at an estimated cost of $48,275,000. CENTRAL A N D S O U THE R N FLORIDA B A S I N

Comprehensive Plan cau'^n ^"^ "'°'^'^ The comprehensive plan for flood control and other purposes in cen62 Stat. 1176. tral aud southern Florida approved in the Act of June 30, 1948, and subsequent Acts of Congress, is hereby modified to include the following items: The project for flood protection in Hendry County, west of levees 1,2, and 3, Florida, is hereby authorized substantially as recommended hj the Chief of Engineers in House Document Numbered 102, Eightyeighth Congress, at an estimated cost of $4,986,000. The project for flood protection in southwest Dade County, Florida, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 20, Eighty-ninth Congress, at an estimated cost of $4,903,000. S O U T H A T L A N T I C COASTAL AREA

The project for hurricane-flood protection on Bisoayne Bay, Florida, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 213, Eighty-ninth Congress, at an estimated cost of $1,954,000. P H I L L I P P I CREEK B A S I N, F I /) R I D A

The project for flood control on Phillippi Creek, Florida, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 156, Eightyninth Congress, at an estimated cost of $4,592,000. LOWER M I S S I S S I P P I RIVER B A S I N

Comprehensive Plan cauTi!* '"°'^^^^33 USC 702a^°2"'-

The project for flood control and improvement of the lower Mississippi RiveT, adopted by the Act of May 15, 1928 (45 Stat. 534), as amended and modified, is hereby further modified and expanded to include the projects and plans substantially as recommended by the Chief of Engineers in House Documents Numbered 308 and 319, Eighty-eighth Congress, at an estimated cost of $181,109,000, except that (1) any modified easements required in the improvement of the Birds Point-New Madrid, Missouri, Floodway shall be acquired as