Page:United States Statutes at Large Volume 86.djvu/878

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[86 STAT. 836]
PUBLIC LAW 92-000—MMMM. DD, 1972
[86 STAT. 836]

836

Ante, p. 816.

PUBLIC LAW 92-500-OCT. 18, 1972

[86 STAT.

•'(1) that such works are included in any applicable area wide waste treatment management plan developed under section 208 of this Act; "(2) that such works are in comformity with any applicable State plan under section.303 (e) of this Act; "(3) that such works have been certified by the appropriate State water pollution control agency as entitled to priority over such other works in the State in accordance with any applicable State plan under section 303(e) of this Act; " (4) that the applicant proposing to construct such works agrees to pay the non-Federal costs of such works and has made adequate provisions satisfactory to the Administrator for assuring proper and efficient operation, including the employment of trained management and operations personnel, and the maintenance of such works in accordance with a plan of operation approved by the State water pollution control agency or, as appropriate, the interstate agency, after construction thereof; (5) that the size and capacity of such works relate directly to the needs to be served by such works, including sufficient reserve capacity. The amount of reserve capacity provided shall be approved by the Administrator on the basis of a comparison of the cost of constructing such reserves as a part of the works to be funded and the anticipated cost of providing expanded capacity at a date when such capacity will be required; " (6) that no specification for bids in connection with such works shall be written m such a manner as to contain proprietary, exclusionary, or discriminatory requirements other than those based upon performance, unless such requirements are necessary to test or demonstrate a specific thing or to provide for necessary interchangeability of parts and equipment, or at least two bran(i names or trade names of comparable quality or utility are listed and are followed by the words'or equal'. " (b)(1) Notwithstanding any other provision of this title, the Administrator shall not approve any grant for any treatment works under section 201(g)(1) after March 1, 1973, unless he shall first have determined that the applicant (A) has adopted or will adopt a system of charges to assure that each recipient of waste treatment services within the applicant's jurisdiction, as determined by the Administrator, will pay its proportionate share of the costs of operation and maintenance (including replacement) of any waste treatment services provided by the applicant; (B) has made provision for the payment to such applicant by the industrial users of the treatment works, of that portion of the cost of construction of such treatment works (as determined by the Administrator) which is allocable to the treatment of such industrial wastes to the extent attributable to the Federal share of the cost of construction; and (C) has legal, institutional, managerial, and financial capability to insure adequate construction, operation, and maintenance of treatment works throughout the applicant's jurisdiction, as determined by the Administrator. "(2) The Administrator shall, within one hundred and eighty days after the date of enactment of the Federal Water Pollution Control ^^^^ Amendments of 1972, and after consultation with appropriate State, interstate, municipal, and intermunicipal agencies, issue guidelines applicable to payment of waste treatment costs by industrial and nonindustrial recipients of waste treatment services which shall establish (A) classes of users of such services, including categories of industrial users; (B) criteria against which to determine the adequacy of charges imposed on classes and categories of users reflecting all