PUBLIC LAW 95-000—MMMM. DD, 1977

PUBLIC LAW 9 5 - 8 7 — A U G. 3, 1977 areas and top-soil preservation areas; the location of all impoundments for waste or erosion control; any settling or water treatment facility; constructed or natural drain ways and the location of any discharges to any surface body of water on the area of land to be affected or adjacent thereto; and profiles at appropriate cross sections of the anticipated final surface configuration that will be achieved pursuant to the operator's proposed reclamation p l a n; (15) a statement of the result of test borings or core samplings from the permit area, including logs of the drill holes; the thickness of the coal seam found, an analysis of the chemical properties of such coal; the sulfur content of any coal seam; chemical analysis of potentially acid or toxic forming sections of the overburd e n; and chemical analysis of the stratum lying immediately underneath the coal to be mined except that the provisions of this paragraph (15) may be waived by the regulatory authority with respect to the specific application by a written determination that such requirements are unnecessary; (16) for those lands in the permit application which a reconnaissance inspection suggests may be prime farm lands, a soil survey shall be made or obtained according to standards established by the Secretary of Agriculture in order to confirm the exact location of such prime farm lands, if any; and (17) information pertaining to coal seams, test borings, core samplings, or soil samples as required by this section shall be made available to any person with an interest which is or may be adversely affected: Provided, That information which pertains only to the analysis of the chemical and physical properties of the coal (excepting information regarding such mineral or elemental content which is potentially toxic in the environment) shall be kept confidential and not made a matter of public record. (c) If the regulatory authority finds that the probable total annual production at all locai:ions of any coal surface mining operator will not exceed 100,000 tons, the determination of probable hydrologic consequences required by subsection (b) (11) and the statement of the result of test borings or core samplings required by subsection (b) (15) of this section shall, upon the written request of the operator be performed by a qualified public or private laboratory designated by the regulatory authority and the cost of the preparation of such determination and statement shall be assumed by the regulatory authority. (d) E a c h applicant for a permit shall be required to submit to the regulatory authority as part of the permit application a reclamation plan which shall meet the requirements of this Act. (e) E a c h applicant for a surface coal mining and reclamation permit shall file a copy of his application for public inspection with the recorder at the courthouse of the county or an appropriate public office approved by the regulatory authority where the mining is proposed to occur, except for that information pertaining to the coal seam itself. (f) Each applicant for a permit shall be required to submit to the regulatory authority as part of the permit application a certificate issued by an insurance company authorized to do business in the United States certifying that the applicant has a public liabilitj^ insurance policy in force for the surface mining and reclamation operations for which such permit is sought, or evidence that the applicant has satisfied other State or Federal self-insurance requirements. Such policy shall provide for personal injury and property

91 STAT. 477

Confidential information.

Reclamation plan, requirement. Public inspection.

Insurance certificate.