114
THE GREAT AMERICAN CANALS

grubbed; between these were two other rows forty feet apart which indicated the exact dimensions of the canal; a single row of stakes in the middle marked the exact center of the canal. Those who laughed at the stakes grew sober when men came on over the route boring with four inch augers into the ground every few rods to a depth of twelve feet; by this means the nature of the soil was tested all along the route and estimates could be made of the cost of the digging; thereupon profiles could be drawn by the engineers. Each of the three great sections of the canal was subdivided into very small sections which were to be let to contractors; each working section was bounded, when possible, by a brook or ravine, in order that each contractor might have the advantage of independent drainage. The plan of the state's furnishing the tools for the work of digging the canal was soon changed, the contractors being expected to furnish their own tools. An instance of the skill of the old Erie Canal engineers, in a day when "surveying" was as loose a word as the dictionary contained, is interesting: "While