PLANNING, BUILDING, AND OPENING
115

Benjamin Wright, Esquire, was re-examining and laying off sections from Rome, west along the canal line, it was deemed expedient, as a test to the accuracy of the work, that James Geddes, Esquire, should start, at a given point on the canal line at Rome, and carry a level along the road to the east end of Oneida Lake, marking on permanent objects the height of the surface of the water while the lake was tranquil, at various places from the east to the west end, along its southern shore; that he should then connect by a level, the Oneida with the Onondaga Lake; after which he was to carry a level from the last mentioned lake, at Salina, south about one and a fourth miles to the canal line, and from thence to work to the east, laying off sections along the canal line. This was accomplished, and nine miles at the west end of the summit level were laid out into sections. And the commissioners have the satisfaction to state, that when the level of Mr. Wright had been carried along the canal line, to the place where Mr. Geddes had terminated his line, the levels of these engineers, which embraced a circuit . .